
Work Zone 3 presents a couple of different challenges. Coming from the north, the trail has to veer off the ROW before it hits the end of the State Forest. Where I would like to do that, the stone wall has already toppled over so not much work needs to be done there, however, there is an old, fallen three that needs to be cut up.
Then there are the fallen trees that make up the Tunnel of Love. Ideally, I would like to be able to cut through these fallen trees and at the same time create a type of portal or gateway to this section of the trail without killing the Tunnel.
No comments:
Post a Comment